Clark Refinery-Premcor
For the new loading dock at Premcor’s new demineralization facility, a chemical resistant, traffic resistant system was required to protect the concrete from chemical attack in the area.
Mobile Enterprises was selected by Mason Construction, Inc. the civil contractor, to install the system.
Working in High Gulf Coast Temperatures (Heat index as high as 130 degrees) Mobile crews trowled down a 1/4′ thick chemical resistant system.
Both the owner, Premcor, and the civil contractor, Mason, were very pleased with the work of Mobile crews.
Project: Loading Dock –
Demineralization Building
Owner: Premcor
Port Arthur, Texas
System: Plasite/Semstone Series 600
Trowel Down
Area: 1,184 Square Feet
Completed: July 2000