Cressman Dining Facility

The Cressman Dining Facility was originally built in 1995 with an elevated slab supported by steel joists that had corroded over time.

Sealaska completely removed and rebuilt all the interior components of the structure and selected Mobile Enterprises, Inc. to install the Everlast Epoxy Flooring System in the (19) Kitchen and (11) Dining area rooms scheduled to receive epoxy flooring and integral cove base.

 

Project: Cressman Dining Facility

Owner: Goodfellow Air Force Base San Angelo, TX

System: Everlast Epoxy Systems

Area: 8,400 SF / 2,000 LF of 6” base

GC: Sealaska Constructors, LLC

Completed: February 2014