Firestone BCP Warehouse
A water main broke under the loading dock and below the processing area at BCP warehouse. As a result, The flowing water washed out large voids throughout a 2,500 square foot area.
Working while the facilities were in operation, Mobile crews drilled a series of 2″ diameter injection holes through the 8″ slab and pumped a fluid, flowable fill into the voids, filling them and restoring structural integrity to the loading dock and warehouse slabs.
A total of 40 cubic yards of material was pumped utilizing a large capacity concrete pump which was supplied directly from redi-mix trucks.
Project: Void Filling
BCP/Warehouse
Owner: Firestone Polymers
Division of Bridgestone/
Firestone
System: Flowable Fill Mix
Area: 40 Cubic Yards/2,500 SF
Completed: July 2000