Dallas Convention Center

Dallas Convention Center

Dallas Convention Center Project: Dallas Convention Center Owner: City of Dallas, TX Architect: HKS, Inc. Contractor: Manhattan Construction System: Sika MonoTop 611 SikaRepair SHB Area: 125 C.F. Completed: November, 2001 A major expansion of the Dallas Convention...
Dallas Morning News Pedestrian Bridge

Dallas Morning News Pedestrian Bridge

Dallas Morning News Pedestrian Bridge This cantilevered pedestrian bridge was experiencing severe spalling. Cracks, rebar corrosion, spalls, etc. Repairs: Chip and key in delaminations Blast and coat rebar Rebar replacement Spall repair using Sika 224 Shotblast top...
Dallas Methodist Hospital

Dallas Methodist Hospital

Dallas Methodist Hospital Before After pulling the post-tension cables in an overhead beam on the second level of a new concrete Garage structure at the Dallas Methodist Hospital, a 9-foot section of the beam delaminated causing the concrete to spall. Following the...
Four Leaf Towers Emaco

Four Leaf Towers Emaco

Four Leaf Towers Emaco Before A raging fire swept through portions of the fifth, sixth and seventh floor of the Four Leaf Towers Condominiums located in Houston’s exclusive Post Oak / Galleria area. Mobile’s crews installed an engineered shoring system and...
Firestone BCP Warehouse

Firestone BCP Warehouse

Firestone BCP Warehouse A water main broke under the loading dock and below the processing area at BCP warehouse. As a result, The flowing water washed out large voids throughout a 2,500 square foot area. Working while the facilities were in operation, Mobile crews...
Page 4 of 9« First...23456...Last »