Dallas Morning News

Before

This cantilevered pedestrian bridge was experiencing severe spalling, cracks, rebar corrosion, spalls, etc.

Repairs:

  • Chip and key in delaminations
  • Blast and coat rebar
  • Rebar replacement
  • Spall repair using Sika 224
  • Shotblast top deck
  • Epoxy crack repair
  • Waterproof Urethane Deckcoating

After concrete repair and deckcoating, steel beams were installed by John A. Arnold, general contractors.

Project: Pedestrian Bridge

Owner: Dallas Morning News

General Contractor: J. A. Arnold Construction

Engineer: Brockett, Davis, and Drake

Completed: December 2002

During

After