Air Liquide America Corp.

Air Liquide America Corp.

Air Liquide America Corp. Before The Bayport Facility of Air Liquide America Corporation was adding additional process piping to an existing pipe run which required that the concrete pipe rack supports be strengthened. Mobile Enterprises crews removed unsound,...
Four Leaf Towers

Four Leaf Towers

Four Leaf Towers Before A fire swept through portions of the fifth, sixth, & seventh floors of the exclusive Four Leaf Towers West Condominiums, causing severe damage to the structural concrete. After Mobile Crews performed structural concrete patching and...
Fort Polk

Fort Polk

Fort Polk Project: Fort Polk Bldg 350 Blast Strengthening Owner: U.S.Army System: Watson Bowman Acme “Mbrace” Carbon Fiber Area: 5,500 SF Completed: May 2003 Several buildings at Fort Polk, Louisiana were being remodeled for new uses. Building 350 was located to near...
Houston ISD – Madison High School

Houston ISD – Madison High School

Houston ISD – Madison High School Before At some time, all the tensioning strands in a double tee had been cut. (2 Stems). This allowed the two stems to deflect as much as 2”. Concerned with the safety of the students in the classrooms, HISD engaged a structural...
Houston Convention Center Hotel

Houston Convention Center Hotel

Houston Convention Center Hotel   An error in concrete placement resulted in several large “Rock Pockets” in several columns and beams in the basement level on the new 22 story Convention Center Hotel located at the George R Brown Convention Center...