Hopkins County Memorial Hospital

Hopkins County Memorial Hospital

Hopkins County Memorial Hospital Renovation plans  to the Hopkins County Memorial Hospital included a new walkway link from the ICU Addition to the new Day Surgery Building.  The new walkway link was to be constructed on the roof of the existing building.  The...
I-20 Spur 156 Bridge Column – Structural Repair

I-20 Spur 156 Bridge Column – Structural Repair

I-20 Spur 156 Bridge Column – Structural Repair Before An 18-wheeler impacted and severely damaged a bridge support column on westbound I-20 near the border.  After review by a structural engineer, it was determined that some of the vertical reinforcing steel...
Mass Mutual

Mass Mutual

Mass Mutual During An automobile fire caused severe damage to three (3) double tee stems in the parking garage of a major San Antonio office complex parking garage. The fire caused cracking, spalling and deflection of the double tee stems. After an engineering...
Peterbilt Motor Company

Peterbilt Motor Company

Peterbilt Motor Company Before The first floor structure of Peterbilt’s corporate offices consists of precast double tees supported by cast-in-place concrete beams. Damp conditions in the crawl space and a lack of sufficient coverage over reinforcing steel had caused...
Parc Condominiums

Parc Condominiums

Parc Condominiums Before The owner of the Parc Condominiums was enlarging his personal condo into a two story unit. This required cutting out a section of the ceiling and the next floor above to accommodate the new stairwell. Prior to making the cut, Mobile...