CertainTeed Insulation Cullet Bunker

CertainTeed Insulation Cullet Bunker

  CertainTeed Insulation-Cullet Bunker   Jim Nisely with P1 Group Construction selected Mobile Enterprises to install the 1.5″ thick EucoFloor topping system to the backwall and slab of a new 13.5′ x 14′ cullet bunker at the CertainTeed...
Clark Field House

Clark Field House

Clark Field House Before Construction Zone selected Mobile Enterprises, Inc. to shotblast the floor slab in designated rooms at the Clark Field House to remove existing paint and install General Polymers 3589 epoxy base coat and their 4648 Polyurethane topcoat with a...
Cotton Bowl Renovation

Cotton Bowl Renovation

Cotton Bowl Renovation Project: Cotton Bowl Renovation 2013 Owner: City of Dallas GC: Balfour Beatty Construction Co. System: Neogard’s Traffic-Tuff and Moisture-Mitigating Primer Area: 50,000 SF Completed: October 2013 Balfour Beatty selected Mobile Enterprises to...
Coca-Cola Floor Repair

Coca-Cola Floor Repair

Coca-Cola Floor Repair Mobile Enterprises has been fortunate over the past several years to have had the pleasure to provide a variety of flooring repairs at the Coca-Cola Syrup Plant facility in Dallas, Texas. Here are just two examples of utilizing a...
Coat Calcine Silo Tops

Coat Calcine Silo Tops

Coat Calcine Silo Tops Rainwater and clean up water was penetrating cracks in the rooftops of three Calcine Coke Storage Silos at the pier of Great Lakes Carbon Corporation in Port Arthur, Texas. Great Lakes Carbon Corporation elected to rout out all moving cracks,...