ISP 6D Process Area Floor & Mezzanine

ISP 6D Process Area Floor & Mezzanine

ISP 6D Process Area Floor & Mezzanine Before Built in 1940, the four process areas, 6 A, B, C & D floor and mezzanine areas had never been protected or repaired properly. When ISP Elastomers, the new owner took over, one of the first goals was to repair the...
Lower Neches Valley Coatings/Linings Test

Lower Neches Valley Coatings/Linings Test

Lower Neches Valley Coatings/Linings Test Project: Coatings / Linings Test 2nd B I Lift Owner: Lower Neches Valley River Authority System: Tnemec Corporation Area: 3,124 Square Feet Completed: March, 2002 The Lower Neches Valley Authority (LNVA) provides water to...
Mobil Tanks 425 & 426

Mobil Tanks 425 & 426

Mobil Tanks 425 & 426 Project: Lining Tanks T-425 / T-426 Owner: Mobil Chemical Company BC Specialties Plant System: Ceilcote Coroline 505 Area: 4,480 Sq. Ft. Completed: September, 1998 Mobil Chemical Company engaged Mobile Enterprises, Inc. to install a lining...
Monsanto 650 Containment

Monsanto 650 Containment

Monsanto 650 Containment Before The Monsanto Company required a protective lining system for several containment areas. Requirements for the lining system included chemical resistance, flexibility, seamless installation, and, because of production demands, rapid cure....
Moody Gardens

Moody Gardens

Moody Gardens Project: Moody Gardens Galveston, Texas Designer: BIOS, Inc. Architect: Morris Architects GC: Gilbane 1st Tier Sub: Western Waterproofing System: EnviroLasticĀ® AR 425 Area: 80,000 Sq. Ft. Exhibit Tanks, Ozone Tanks, Process Water Tanks, Service Areas...