Firestone BCP Warehouse

Firestone BCP Warehouse

Firestone BCP Warehouse A water main broke under the loading dock and below the processing area at BCP warehouse. As a result, The flowing water washed out large voids throughout a 2,500 square foot area. Working while the facilities were in operation, Mobile crews...
Florida Power and Light – Windmill Farm

Florida Power and Light – Windmill Farm

Florida Power and Light – Windmill Farm Spread across the west Texas landscape, each 230 foot tall wind turbine tower is anchored by a 15-foot diameter, 3” thick steel ring-shaped base plate. Voids were discovered in the grout bed of 63 towers. Working in...
Greenway Plaza Cooling Tower Repair – Emaco

Greenway Plaza Cooling Tower Repair – Emaco

Greenway Plaza Cooling Tower Repair – Emaco Before Years of reinforcing steel corrosion had delaminated the upper portion of the Central Plant Cooling Tower Basin wall to the point that the top of the wall was about to fall off. Mobile’s crew removed the unsound...
Gateway Park

Gateway Park

Gateway Park The new concrete columns and fence wall at the City of Fort Worth Gateway Park revealed signs of the formwork that needed to be remediated. Mobile Enterprises, Inc. was contracted to resurface the new concrete elements with a slurry coat of SikaTop 123...
HKS Garage Repairs

HKS Garage Repairs

HKS Garage Repairs Project: HKS Parking Garage Repairs Owner: HKS Architects Dallas, TX Engineer: Brockette Davis Drake System: Degussa Emaco S88 C8 x 13.75 Galv. Channels Beams : 8 Beams Joists: 7 Joists Completed: November, 2003 Years of water infiltration had taken...